• español
    • English
    • português
  • English 
    • español
    • English
    • português
  • Login
View Item 
  •   Home
  • Tesis y Trabajos de Grado
  • Tesis y Trabajos de Grado de Posgrado
  • Especialización en Diseño Urbano
  • View Item
  •   Home
  • Tesis y Trabajos de Grado
  • Tesis y Trabajos de Grado de Posgrado
  • Especialización en Diseño Urbano
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
RecursosRecursos de apoyo¿Cómo publicar?

Browse

All of ExpeditioCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects
This CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage StatisticsView Google Analytics Statistics

Documento técnico de soporte plan parcial Avenida Ferrocarril Calle 13

Thumbnail

Citación

       
Export: <XML METS>
View/Open
Ver documento (5.495Mb)
Date
2021
Author
Mora Parrales, Ammy Julieth
Advisor
Chica Mejía, Juan Eduardo
Villamil Mejía, Claudia Alejandra
Hashtag(s)
#DocumentoTécnicoDeSoportePlanParcialAvenidaFerrocarrilCalle13
#PlanParcialAvenidaFerrocarrilCalle13
#DocumentoTécnicoDeSoportePlanCalle13
Metadata
Show full item record
Documentos PDF
Abstract
El presente documento corresponde a la revisión y ajustes de una propuesta del plan parcial adoptado por la Secretaria Distrital de Planeación catalogado como: Plan Parcial de Renovación Urbana “Ferrocarril - Calle 13”, el cual se aprobó con el Decreto Distrital 800 de 20 de diciembre de 2019 “Por medio del cual se adopta el Plan Parcial de Renovación Urbana “Ferrocarril – Calle 13”, ubicado en la localidad de Puente Aranda y se dictan otras disposiciones” Por lo tanto, el documento, presentará el estudio del componente de diseño urbano para el proyecto en mención, cuyo planteamiento estuvo a cargo del señor Luis Fernando Ballesteros Urbina, representante legal del Grupo Accanto S.A.S., en calidad de apoderado de la sociedad FIDUCIARIA BOGOTA S.A., mediante las referencias No. 1-2019-09726 del 19/02/2019, 1-2019-13323 del 06/03/2019 y 1-2019-17829 del 21/03/2019 (PLANEACIÓN, 2019). El presente estudio se elabora y presenta en etapa de diagnóstico para el proyecto en mención, y así mismo se indica que la información y/o documentación soporte para la elaboración de este documento es de carácter primario con el documento técnico de soporte de la formulación por parte de la entidad competente. La propuesta con respecto al análisis realizado se elabora teniendo en cuenta las estructuras existentes y los proyectos que puedan estar involucrados dentro del área de influencia y directa del proyecto, esto con el fin de garantizar una articulación viable y un diseño integral mejorar la condición urbana generada por a la intervención del proyecto.
Summary in foreign language
This document corresponds to the review and adjustments of a proposal of the partial plan adopted by the District Planning Secretary cataloged as: Partial Plan of Urban Renovation "Railroad - Calle 13", which was approved with District Decree 800 of December 20 of 2019 "By means of which the Partial Urban Renovation Plan" Ferrocarril - Calle 13 "is adopted, located in the town of Puente Aranda and other provisions are issued" Therefore, the document will present the study of the urban design component for the project in question, whose approach was in charge of Mr. Luis Fernando Ballesteros Urbina, legal representative of the Accanto SAS Group, in his capacity as attorney-in-fact of the company FIDUCIARIA BOGOTA SA , through references No. 1-2019-09726 of 02/19/2019, 1-2019-13323 of 03/06/2019 and 1-2019-17829 of 03/21/2019 (PLANEACIÓN, 2019). This study is prepared and presented in the diagnostic stage for the project in question, and it is also indicated that the information and / or supporting documentation for the preparation of this document is of a primary nature with the technical document supporting the formulation by part of the competent entity. The proposal regarding the analysis carried out is prepared taking into account the existing structures and the projects that may be involved within the direct and influence area of ​​the project, this in order to guarantee a viable articulation and an integral design to improve the urban condition generated. for the intervention of the project.
Palabras clave
Renovación urbana; Avenida Ferrocarril Calle 13
URI
http://hdl.handle.net/20.500.12010/19532
Collections
  • Especialización en Diseño Urbano [67]
Comments

Respuesta Comentario Repositorio Expeditio

Gracias por tomarse el tiempo para darnos su opinión.


Carrera 4 # 22-61 Teléfono: (+57 1) 242 7030 - 018000111022 Fax: (+57 1) 561 2107 Bogotá D.C., Colombia

Fundación Universitaria de Bogotá Jorge Tadeo Lozano | Vigilada Mineducación

Institución de educación superior privada, de utilidad común, sin ánimo de lucro y su carácter académico es el de Universidad.

Reconocimiento personería jurídica: Resolución 2613 del 14 de agosto de 1959 Minjusticia.

Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional.

 

Términos y condiciones | Políticas

 

 


Carrera 4 # 22-61 Teléfono: (+57 1) 242 7030 - 018000111022 Fax: (+57 1) 561 2107 Bogotá D.C., Colombia

Fundación Universitaria de Bogotá Jorge Tadeo Lozano | Vigilada Mineducación

Institución de educación superior privada, de utilidad común, sin ánimo de lucro y su carácter académico es el de Universidad.

Reconocimiento personería jurídica: Resolución 2613 del 14 de agosto de 1959 Minjusticia.

Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional.

 

Términos y condiciones | Políticas